info@hojmarine.com
+45 75 62 84 11
  • News
  • References
en
dade
Rederiet HØJ logoRederiet HØJ logo
  • Port Construction and Marine Works
    • Boulder Clearance
    • Artificial Reefs
    • Diving
    • Cabling and Cable Trenches
    • MBES surveys
    • Pier Construction
    • Marine Pumping Station
    • Blasting
    • Scour Protection
    • Extraction of Piles and Pillars
    • Excavation and Dredging
    • Waterways and Infrastructure
  • Offshore Wind
    • Boulder Clearance
    • Cabling and Cable Trenches
    • MBES surveys
    • Scour Protection
  • Climate Related Projects
    • Boulder Clearance
    • Stone beds
    • Cabling and Cable Trenches
    • Excavation and Dredging
    • Marine Pumping Station
    • Pier Construction
    • Scour Protection
    • Waterways and Infrastructure
  • Our Fleet
    • M/S Vilma Høj – Wire
    • M/S Camilla Høj
    • M/S Alberte Høj – Wire
    • M/S Aase Høj – Wire
    • M/S Lea Høj
    • M/S Elisabeth Høj – Wire
    • Veluwe
    • EH3
    • Hunte
    • M/S Martha Høj
    • M/S Charlotte Høj
  • About Us
    • Safety
    • Certifications
    • Sustainability
      • Vessels and CO2
      • Projects and CO2
      • Climate Related Policies
    • Quality
  • Contact
September 16, 2025

Høj Nordic Marine Contractor finalizes dredging at German island

Efficient dredging ensures free passage and improved navigation in Kirchdorf harbour On the small island…
Read more
August 18, 2025

Stone work in a West Jutland port: Efficient planning and a strong fleet effort

In a maintenance project, securing of port infrastructure in a West Jutland harbor, Høj Nordic…
Read more
June 4, 2025

Vilma completes demanding dredging operation in the German Wadden Sea

Vilma Høj has undertaken a complex and specialized dredging operation in the German part of…
Read more
May 9, 2025

Increase in occupancy strengthens Høj Nordic Marine Contractor

Exceptionally good fleet occupancy in international waters gave the maritime contractor growth on the top…
Read more
May 2, 2025

Scour protection at Danish bridge

Camilla Høj has just completed a long-term marine operation, where Høj Nordic Marine Contractor carried…
Read more
April 16, 2025

Precision work at wind turbines in German waters

Høj Nordic Marine Contractor carried out scour protection repair works in German waters. The project…
Read more
March 10, 2025

Remediation dredging of contaminated sediment in Swedish harbor

Høj Nordic Marine Contractor is undertaking a technically demanding remediation project, removing contaminated sediment with…
Read more
May 23, 2023

Dredging project at Randers Harbour is complete

Dredging project at Randers Harbour has now been completed. The sailing trench’s desired seven metre…
Read more
January 12, 2023

We are building two new stone reefs in the Little Belt

The new stone reefs in the Little Belt Nature Park aim to increase biodiversity and…
Read more

Search this site

  • Port Construction and Marine Works
  • Offshore Wind
  • Climate Related Projects
  • Our Fleet
  • About Us
  • Contact

Latest News

Høj Nordic Marine Contractor finalizes dredging at German island

16 Sep at 10:00 am

Stone work in a West Jutland port: Efficient planning and a strong fleet effort

18 Aug at 3:48 pm

Vilma completes demanding dredging operation in the German Wadden Sea

4 Jun at 2:27 pm

Contact Us

info@hojmarine.com
+45 7562 8411
Blumersgade 8B, GF · DK-8700 Horsens
  • Danish
  • English
  • German