Dredging, new breakwater, and disposal of material.
Pumping of 10,000 m3 of contaminated material.
Excavation for Ø1100 mm polyethylene pipeline, approximately 640 m, in 2016.
Dredging, new breakwater, and disposal of material.
Pumping of 10,000 m3 of contaminated material.
Excavation for Ø1100 mm polyethylene pipeline, approximately 640 m, in 2016.
Comparison of the specifications of our vessels. Contact us at telephone number: +45 75 62 84 11 or email: info@hojmarine.com.