Due to contamination, the customer wanted to have a larger area covered by a 50 cm layer of sand and then a 30 cm layer of rock.
The project was completed in three months using a hopper barge. In all, 110,000 m³ of sand and 35,000 m³ of rocks were placed. The water depth ranged between 10 and 40 m.