The work consisted of establishing 800 m of routing for two Ø355 mm wastewater pressure pipes across the Mariager Fjord.
Excavation in soft mud sediments, routing depths of 1.4 to 2.4 m under the existing seabed, equivalent to approximately 15,000 m3. Diver inspection and assistance with placement of pipes in the routing.