info@hojmarine.com
+45 75 62 84 11
  • News
  • References
en
dade
Rederiet HØJ logoRederiet HØJ logo
  • Port Construction and Marine Works
    • Boulder Clearance
    • Artificial Reefs
    • Diving
    • Cabling and Cable Trenches
    • MBES surveys
    • Pier Construction
    • Marine Pumping Station
    • Blasting
    • Scour Protection
    • Extraction of Piles and Pillars
    • Excavation and Dredging
    • Waterways and Infrastructure
  • Offshore Wind
    • Boulder Clearance
    • Cabling and Cable Trenches
    • MBES surveys
    • Scour Protection
  • Climate Related Projects
    • Boulder Clearance
    • Stone beds
    • Cabling and Cable Trenches
    • Excavation and Dredging
    • Marine Pumping Station
    • Pier Construction
    • Scour Protection
    • Waterways and Infrastructure
  • Our Fleet
    • M/S Camilla Høj
    • M/S Alberte Høj – Wire
    • M/S Aase Høj – Wire
    • M/S Lea Høj
    • M/S Elisabeth Høj – Wire
    • Veluwe
    • EH3
    • Hunte
  • About Us
    • Safety
    • Certifications
    • Sustainability
      • Vessels and CO2
      • Projects and CO2
      • Climate Related Policies
    • Quality
  • Contact

Search this site

  • Port Construction and Marine Works
  • Offshore Wind
  • Climate Related Projects
  • Our Fleet
  • About Us
  • Contact

Latest News

We are building two new stone reefs in the Little Belt

12 Jan at 2:24 pm

Høj changes its name to Høj Nordic Marine Contractor

December 6, 2022

Høj expands the fleet with two new vessels

July 10, 2022

Contact Us

info@hojmarine.com
+45 7562 8411
Blumersgade 8B, GF · DK-8700 Horsens
  • Danish
  • English
  • German