In the spring of 2026, Høj Nordic Marine Contractor carried out an extensive maintenance dredging project at the entrance channel to Asaa Harbour. The project involved removing a substantial volume of sediment from the navigation channel for disposal at an approved offshore disposal site, while part of the dredged material was relocated to a designated bypass area.
Although Asaa Harbour is relatively small, the project was significant in scale. Large volumes of sediment had to be removed to restore the required navigational depths in the approach channel, ensuring safe vessel access and supporting the harbour’s daily operations.
Coordinated Marine and Landside Operations
The project was completed through close coordination between marine and landside equipment. While the dredger Elisabeth Høj carried out the maintenance dredging within the navigation channel, a local contractor supported the operation with a specially modified excavator capable of operating in shallower water than the vessel could safely access.
This combination proved essential to the project’s success. The excavator continuously relocated dredged material further away from the navigation channel, significantly reducing the risk of sediment migrating back into the dredged area during the operation. Sediment backflow was the project’s primary technical challenge, requiring precise coordination and continuous adjustment of the operational sequence throughout the works.
Elisabeth Høj – Built for Coastal and Harbour Dredging
Elisabeth Høj played a central role in the project. The vessel is purpose-built for marine construction and maintenance dredging operations in coastal and harbour environments, where restricted water depths and limited working space often present operational challenges.
Equipped with an advanced excavation system and excellent maneuverability, Elisabeth Høj can operate with high precision in narrow navigation channels and under varying seabed conditions. Its combination of dredging capacity and operational flexibility makes the vessel particularly well suited for projects such as Asaa, where efficient sediment handling and accurate positioning are essential.
The works in Asaa required a high level of precision and careful timing. In shallow-water environments, where currents and seabed conditions can rapidly influence sediment movement, efficient and controlled execution is crucial to achieving a stable and lasting result.
By combining maintenance dredging with the continuous relocation of sediment in shallow waters, the navigation channel remained operational throughout the project while minimizing the risk of sediment returning to the dredged area.
Planning for Sediment Dynamics
The project at Asaa Harbour demonstrates how close coordination between marine and landside resources can be decisive when carrying out maintenance dredging in shallow-water environments. By incorporating sediment transport and movement into the operational planning, the navigation channel remained clear throughout the execution of the works. Even on projects where restricted water depths and confined working conditions demand tailored solutions.