info@hojmarine.com
+45 75 62 84 11
  • News
  • References
en
dade
Rederiet HØJ logoRederiet HØJ logo
  • Port Construction and Marine Works
    • Boulder Clearance
    • Artificial Reefs
    • Diving
    • Cabling and Cable Trenches
    • MBES surveys
    • Pier Construction
    • Marine Pumping Station
    • Blasting
    • Scour Protection
    • Extraction of Piles and Pillars
    • Excavation and Dredging
    • Waterways and Infrastructure
  • Offshore Wind
    • Boulder Clearance
    • Cabling and Cable Trenches
    • MBES surveys
    • Scour Protection
  • Climate Related Projects
    • Boulder Clearance
    • Stone beds
    • Cabling and Cable Trenches
    • Excavation and Dredging
    • Marine Pumping Station
    • Pier Construction
    • Scour Protection
    • Waterways and Infrastructure
  • Our Fleet
    • M/S Vilma Høj – Wire
    • M/S Camilla Høj
    • M/S Alberte Høj – Wire
    • M/S Aase Høj – Wire
    • M/S Lea Høj
    • M/S Elisabeth Høj – Wire
    • Veluwe
    • EH3
    • Hunte
    • M/S Martha Høj
    • M/S Charlotte Høj
  • About Us
    • Safety
    • Certifications
    • Sustainability
      • Vessels and CO2
      • Projects and CO2
      • Climate Related Policies
    • Quality
  • Contact
August 4, 2026

Two vessels. One integrated solution in Glowe

The images are from another project. How do you move more than 10,000 m³ of…
Read more
July 23, 2026

Erosion protection – the interplay between the seabed, hydrodynamic conditions, and structural engineering

Beneath the water’s surface, scour is a constant challenge. Currents, waves, and vessel traffic gradually…
Read more
July 9, 2026

Artificial stone reefs bring life back to the sea

Artificial stone reefs play an important role in restoring biodiversity in Danish waters. However, their…
Read more
June 26, 2026

Disposal Permit Processes Have Become a Bottleneck for Danish Ports

While much attention is being paid to financing the green transition, another equally critical challenge…
Read more
June 10, 2026

Danish forces battled winter and ice during extensive German dredging project

With up to 25 cm of ice and sub-zero temperatures challenging both equipment and accessibility,…
Read more
May 29, 2026

Dumping permits have become the new bottleneck

By Michael Normann, CEO, Høj Nordic Marine Contractor By Michael Normann, CEO, Høj Nordic Marine…
Read more
April 21, 2026

Maritime precision project on Sweden’s west coast

In Videberg Hamn on Sweden’s west coast, nine buoys had to be relocated while sediment…
Read more
February 19, 2026

Dredging of cable route across the Fehmarn Belt

Dredging of an approximately 2,000 metre long cable route across the Fehmarn Sound is carried…
Read more
December 3, 2025

Erosion Protection at the Alssund Bridge

The vessel Aase Høj is placing 1,800 m³ of stone material as scour protection around…
Read more
September 16, 2025

Høj Nordic Marine Contractor finalizes dredging at German island

Efficient dredging ensures free passage and improved navigation in Kirchdorf harbour On the small island…
Read more

Search this site

  • Port Construction and Marine Works
  • Offshore Wind
  • Climate Related Projects
  • Our Fleet
  • About Us
  • Contact

Latest News

Danish dredging project secured safe navigation in Schleswig-Holstein

3 Sep at 10:00 am

Two vessels. One integrated solution in Glowe

4 Aug at 10:00 am

Erosion protection – the interplay between the seabed, hydrodynamic conditions, and structural engineering

23 Jul at 10:00 am

Contact Us

info@hojmarine.com
+45 7562 8411
Blumersgade 8B, GF · DK-8700 Horsens
  • Danish
  • English
  • German